Completed project
"Sima-Land" office in Yekaterinburg
Main tasks:
Bring natural light into rooms without windows, avoid breaking the windows and safe the facade of the building, reduce the energy load of the building
Baseline data

Office size: 9 000 m²
Location: commercial warehouse terminal area
Window availability: none

TASK:
  • bring natural light into a room without windows
  • reduce the energy load of the building
  • create comfortable lighting in the workplace for the 2,500 employees
Baseline data

Office size: 9 000 m²
Location: commercial warehouse terminal area
Window availability: none

TASK:
  • bring natural light into a room without windows
  • reduce the energy load of the building
  • create comfortable lighting in the workplace for the 2,500 employees

Stages of task solving

Stages of task solving

STEP №1
Designed the solution and developed the natural and artificial light controllers
STEP №2
87 fibre optic cables up to 4 metres long were installed, connected to the SolarOS smart lighting system which created biodynamic lighting at the workplace
STEP №3
Installation of the fibre optic cables and the SolarOS system took 116 days

Results of the project



Results of the project



Achieved the daylight factor of 3%
Provided natural light to rooms without windows with an efficiency factor of 3%
Energy load reduced by 85%
Effect of installing fibre optics - 85% reduction in building energy load
Increased employee efficiency
Increased employee efficiency and desire for creativity by providing healthy, dynamic lighting in the workplace
Achieved the daylight factor of 3%
Provided natural light to rooms without windows with an efficiency factor of 3%
Energy load reduced by 85%
Effect of installing fibre optics - 85% reduction in building energy load
Increased employee efficiency
Increased employee efficiency and desire for creativity by providing healthy, dynamic lighting in the workplace

Final project deliverables


87
The first Russian
lighting control
solution implemented
Number of lighting
fibres with hybrid
lighting installed
116 days
Duration of installation of
fibre optics
0
Number of new windows in the
building facade

ОФИС СИМА-ЛЕНД

87
Number of lighting fibres with hybrid lighting installed
116 days
Duration of installation of fibre optics
0
Number of new windows in the building facade

Applications used

Applications used

SolarOS smart lighting
Solargy SW fibre optics

Project gallery

Project gallery

See more photos
Let's talk about your project
Let's talk about your project

Мы свяжемся с вами в ближайшее время для консультации по вашему проекту

Заполните ваши контактные данные для ускорения коммуникации

Нажимая на кнопку “Получить консультацию по проекту” вы соглашаетесь с политикой конфиденциальности сайта

The SolarOS smart lighting system is already used by