Completed project
National cultural center in Kazan
Main tasks:
Bring natural light into rooms without windows, avoid breaking the windows and safe the facade of the building, reduce the energy load of the building
Baseline data

Site location: Kazan
Type of premise: reading room
Existence of windows: none

TASK:
  • bring natural light into a room without windows
  • reduce the energy load of the building
  • avoid breaking the windows and safe the facade of the building
Baseline data

Site location: Kazan
Type of premise: reading room
Existence of windows: none

TASK:
  • bring natural light into a room without windows
  • reduce the energy load of the building
  • avoid breaking the windows and safe the facade of the building

Stages of task solving

Stages of task solving

STEP №1
Designed the solution and calculated the natural daylight factors from the floor plan provided by the client. It was decided to reject using the skylights in favour of fibre optics. There are no leaks in the fibre optics and they provide sufficient light, even with high ceilings.
STEP №2
A total of 112 fibre optic cables connected to the SolarOS smart lighting system.
STEP №3
Installation of the fibre optic cables and installation of the SolarOS system took 2 months

Results of the project



Results of the project



Achieved the
daylight factor of 3%

Provided natural light to rooms without windows with an efficiency factor of 3%.
Energy load
reduced by 85%
Effect of installing fibre optics - 85% reduction in building energy load
The project was delivered on time
The reconstructed museum complex was opened just in time for the 100th anniversary of the TASSR
The facade of the building was saved
The facade of the museum complex building, which is a historical site, was preserved
Achieved the
daylight factor of 3%
Provided natural light to rooms without windows with an efficiency factor of 3%.
Energy load
reduced by 85%
Effect of installing fibre optics - 85% reduction in building energy load
The project was delivered on time
The reconstructed museum complex was opened just in time for the 100th anniversary of the TASSR
The facade of the building was saved
The facade of the museum complex building, which is a historical site, was preserved

Final project deliverables


112
The first Russian
lighting control
solution implemented
Number of lighting
fibres installed
with hybrid lighting
2 months
Duration of installation
of fibre optics
0
Number of new windows in the
building facade

ОФИС СИМА-ЛЕНД

112
Number of lighting fibres installed with hybrid lighting
2 months
Duration of installation of fibre optics
0
Number of new windows in the building facade

Applications used

Applications used

SolarOS smart lighting
Solargy SW fibre optics

Project gallery

Project gallery

See more photos
Let's talk about your project
Let's talk about your project

Мы свяжемся с вами в ближайшее время для консультации по вашему проекту

Заполните ваши контактные данные для ускорения коммуникации

Нажимая на кнопку “Получить консультацию по проекту” вы соглашаетесь с политикой конфиденциальности сайта

The SolarOS smart lighting system is already used by